• Replaced two 75 MVA Transformers with 90 MVA Transformers
  • Replaced six (6) Sections of 15kV switchgear and rerouted get-a-way conduits.
  • Installed new Fire Protection Water Mist System, Alarms and Controls
  • New A&B trenches and conduit system
  • New station lighting and Emergency Lighting and Exit sign
  • New transformer bays with forced air ventilation and implementing noise reduction techniques to meet stringent local noise requirements.
  • Added two 54MVAR capacitor banks
  • Diesel emergency generator