Project sheet narrative: Provided analysis, engineering design, project management, estimating, and preparation of Issue for Construction plans and specifications, as well as construction support for the replacement of Station 917 and modifications to the existing seven transmission lines. The station is expected to be classified as bulk power and the design will comply with NPCC.

The Eversource Bourne Station 917 is being replaced with a new station, adjacent and to the west of the existing station. The new station will consist of ultimately six bays, a breaker, and a half a new control and relay house. The station arrangement will allow space for the future second tie breaker and future additional bays has been classified as bulk power and the design will comply with NPCC. The existing seven lines will be moved in a phased cutover approach, at two lines per year starting in 2021.

Vanderweil scope is to provide engineering, project management, estimating, and construction support services. Engineering services will include design, calculations and analysis, and the preparation of the Issue For Construction (IFC) plans and specifications, as well as assistance with construction support.